Place of Origin:
China
Brand Name:
CDN
Certification:
CE
Model Number:
CDN-DM136
Contact Us
1. Power Supply: Solar Cell(monocrystalline silicon )2.5V/165MA
2. Power storage: NI-MH Battery 1.2V/600MAH
3. Working Time: Under the normal light intensity,it can work 72h when it basked for 8h.
4. Aluminum alloy body with high resist compression is >35 tons.
5 Display: φ5 bright anti-fog LED, color can be customized
6. Working mode: flashing (2Hz + 20%) and steady light
1.Solar powered,saving energy and protecting environment, installing conveniently,.
2.Standalone power supply, lighting automatically at night or rainy day, warning effect is obvious.
3.Imported silicon wafer, stable performance, high conversion efficiency.
4.Long service Lifespan:Work more than 3 years normally.
5. Long working time:It can work over 72 hours in the foggy or rainy days after fully charged at 8 hours.
6.High quality and really good factory price.
1.Mainly used for tunnel,turnoff.
2.school gate,accident-prone highway or bend.
3.Foggy area (seaside,airport area), highway or non-street light area.
4.The ramp , curve or some dangerous roads.
Solar road stud installation is not a complicated matter, but there are many details that require attention. These details play an important role in ensuring the quality and service life of spike.
1. This is most important, please placed in isolation facilities installation safety first, then everyone should be in the safe facility when installing.
2. Determine the installing location. To ensure the installing location is smooth, should level scalable, craks, uneven pavement first, also please be sure the solar panel is being shined by sunlight .
3. To ensure the installing location dry, should clean up it with the brush,
4. Evenly apply appropriate glue on the spike;
5. Firmly press the spike on the installation location with right direction, if the glue is more, please must clean it up;
6. If it is aluminum alloy with pillar, the hole depth must be 1cm deeper than the pillar, hole diameter must be 2mm larger than pillar diameter.
7. After installing, please check it every 2h, to ensure that all the spikes are installed at the right direction and good condition.
8. After the glue curing for 4 hours, removed installation isolation facilities.
Send your inquiry directly to us